| |
| |
|
|
With our experience and expertise, we can
help you realise your vision of a world-class
transport system. |
| |
|
|
For assistance, contact
Manager, Engineering
SMRT Engineering Pte Ltd
300 Bishan Road
Singapore 579828
Tel: 6554 8535
Fax: 6453 7645
Email: Engineering |
| |
|
|
We provide Operations and Maintenance
services to international transport owners.
Some of our significant projects include: |
| |
|
| |
| Asia Pacific |
|
| |
| Ho Chi Minh
City Rail System, Asian Development
Bank |
| |
|
 |
Recommendations to Asian
Development Bank on revenue
optimisation and
opportunities for non-fare revenue
for Ho Chi Minh City Rail System |
| |
|
| |
|
| |
|
| |
|
| |
|
| |
|
|
|
|
| |
|
|
|
|
| |
| Bangkok Metro Company
Ltd |
| |
|
 |
Training for Bangkok Metro Company
Ltd (BMCL) senior management and staff
in the following areas: |
| |
 |
Overview of O&M of a
transit system |
 |
Scope of work and responsibilities
of work groups within a railway
organisation |
 |
Station operations |
 |
Central Supplies |
 |
Maintenance
Management System |
|
 |
Tailored staff attachment with SMRT
to help BMCL staff gear-up for revenue
service |
| |
|
|
|
|
| |
|
|
|
| |
| Bangkok Transit System |
| |
|
 |
Partner MSI in the provision of |
| |
 |
Technical support for the supply
of refurbished Magnetic Ticket encoder
/ decoder |
 |
Training for Bangkok Transit System
(BTS) staff on the operation and maintenance
of the equipment |
 |
Testing of BTS upgraded Automatic
Fare Collection System |
|
| |
|
| |
|
| |
|
|
|
| |
| Delhi Metro Rail Corporation |
| |
|
 |
Provide training to Delhi Metro (DMRC)
staff in the following areas: |
| |
 |
MRT Structure and P-Way Maintenance
Operation |
 |
RS EMU Overhaul |
 |
Train Operation |
|
 |
Supervise maintenance activities |
 |
Advise DMRC on Depot Working Procedures |
 |
Assist in the review of existing facilities
of depot for maintenance / overhaul of trains
and recommend improvements |
| |
|
|
|
|
| |
| Marubeni Corporation |
| |
|
 |
Provide consultancy to Marubeni Corporation
(Marubeni) in their bid for Manila LRT2
Project: |
| |
 |
Preparation of maintenance proposal
and business plan for submission to
the Manila Transport Authority |
|
 |
Provide one consultant to monitor and
update the progress of construction, and
another, for the Testing and Commissioning
of the Manila LRT2 System |
| |
|
|
|
| |
|
| |
| Nanjing Metro |
| |
|
 |
Provide training to Nanjing Metro management
and supervisory level staff to prepare them
for their initial start-up operation. The
focus of the training was in rail operations,
rolling stock maintenance (including maintenance
functions) and support services function. |
| |
|
|
|
| |
|
| |
| Shanghai Metro Company
Ltd |
| |
|
 |
Advise Shanghai Metro Company Ltd on
the planning, design, and preparation of
train operation time-table, Automatic Train
Control readiness, and safe run-in for the
initial start-up of the system |
| |
|
|
|
| |
|
| |
| Taipei Rail Transit Corporation |
| |
|
 |
Reviewed EMU Overhaul Plans and Procedures
and provide guidance for one complete EMU
Overhaul to Taipei Rail Transit Corporation
(TRTC) |
 |
Trained TRTC staff in the overhaul of
the propulsion and auxiliary systems of
the EMU |
| |
|
|
|
|
| |
|
| |
| Middle East |
| |
| Sharjah Transport
Authority |
| |
|
 |
Partner CPG Corp to conduct Public
Transportation Study for Sharjah Public
Transport Authority |
| |
|
|
|
|
| |
|
|
|
| |
| |
| Nakheel |
| |
|
 |
Provide mobilisation, pre-operation
preparation, and on-going maintenance
and operation of the Palm Jumeirah
Rail Transit monorail system.
This is the first monorail system
in the Middle East and is being
built at a cost of 1.4billion
AED. The 5.45km system is fully
elevated, runs on a double track
system and has 4 stations. |
| |
|
|
|
|
| |
|
|
|
|
|
| |
| Singapore |
| |
| Sentosa Development Corporation |
| |
|
 |
Project manager for The Sentosa Express,
a S$140 million, 2.1 km, double-tracked
monorail system linking mainland Singapore
and Sentosa Island. |
 |
As the consultant, SMRT worked with Sentosa
to develop the conceptual plan and operating
principles for the system, established the
design requirements and technical specifications
for the tender and led in the short listing,
evaluation and recommendation of the award
of the system supplier. |
 |
Representing the owner, SMRT Engineering
oversaw the construction and installation
phase of the project. To ensure the monorail
trains and its associated control systems
comply with international railway safety
standards, we undertook design reviews and
pre-delivery inspections. Additionally,
we advised Sentosa on critical operations
and maintenance issues and provided solutions
on how to integrate systems with long-term
operations. |
| |
|
|
|
| |
|
| |
| Sentosa Development Corporation |
| |
|
 |
Consultant and Project Manager for Access
Control and Ticketing System at Sentosa
Island |
| |
|
|
|
| |
| |
| Jurong Bird
Park |
| |
|
 |
Provided consultancy on Panorail
inspection and troubleshooting
for Panorail system |
| |
|
|
|
|
| |
|
| |
|
|
|
|
| |
| South America |
| |
| Maritima Petroleo Engenharia
Ltd |
| |
|
 |
Provide consultancy to Maritima Petroleo
Engenharia Ltd (Maritima) for their bid
for the
metro and bus O&M in Brazil. This included
development of Metro and Bus O&M Plans
and Integration Plan |
| |
|
| |
|
|
| |
| |